Jiangsu Cowain Automation Technology Co., Ltd. - PLM
release time 2020-12-29
source
Pageviews 757

Project requirements:

1. Documents, drawings, and 3D models are stored locally, which are difficult to find, use, borrow, and cannot be managed in a unified manner.

2. The engineer maintains the BOM table and the change table manually, which is slow in efficiency and easy to make manual errors.

3. It is difficult for Excel to maintain the BOM to find the borrowing relationship between parts, and it is difficult to change.

4. The materials and BOM are manually maintained to ERP by personnel, occupying resources and easily causing data errors.


Project achievement goal:

1. Introduce advanced management concepts and models, and manage each life cycle of product data in a standardized and orderly manner.

2. Solve the efficient collaboration between different stages of the product, different participants and organizations, optimize the business process, improve work efficiency, shorten response time, and bring better profit returns to the enterprise.

3. Knowledge sharing and reuse management, through knowledge classification and sorting, effective management of it, forming the enterprise's knowledge assets.

4. Build a multi-system integration system to integrate the ERP, CAD, CAE and other systems currently in use with PLM to achieve clear functional positioning and efficient integration between systems, and improve the efficiency of information sharing.

©Copyright 2010-2020 Cowain